molding, mold, offsourcing, color changing
molding, mold, offsourcing, color changing
Case Study > Vacuum cleaner HW508
About Us
Plastic Specialist
New Product Development
Facility
Customer Service
News
Case Study
 

And then was the phase of mold building. Our company used CNC, EDM, wire cutting, milling machine, grinding machine, polishing, and heat treatment and so on to build the mold. We priced the mold at120 thousand RMB, but at last the price was lowered to 110 thousand RMB after two parties' negotiation. That was almost the cost price, but we agreed at that price considering further long-term cooperation.

Then our company need to do is injection and assembly. In the process of assembling, we needed relevant fitting parts, such as electric (al) motor, power cord, spring, circuit board, dust bag and so on. We often buy fitting parts from professional factories. At that time, the factory we contacted at first which produced power cord was very busy, and their price of product was very high too, it was urgent that we had not enough time to deliver the parts. So the outsourcing department contacted with another factory. After negotiation we lowered the price of the power cord from 5RMB to 4.8RMB, and it saved cost too. Usually, fitting parts which were outsourced were scheduled in advance, if we find the parts have some quality problems or the parts can’t meet the clients' requirements, we will inform the supplier to produce again in time. Every fitting part on the vacuum cleaner needed functional and life test, for example, testing vacuum degree of the vacuum cleaner with tube. First we should insert the tube, then put the testing pipe into the inlet of the tube, and cover the inlet with hand. Then we see whether the results on the vacuum meter meet the requirements and the indicator turn red or not. Unaccepted products would be signed with a label and put in certain area. Only after every part and the complete appliance reached the standard that they could be packaged.

 
1 2 3